Epoxy.com Logo - Epoxy, Polyurethane, Polysulfide, Polyester, MMA - Methyl Methacrylate and other Construction Resin Systems - Over 350 Products- Since 1980
[Contact Us]

096280 STATIC CONTROL FLUID-APPLIED ESD EPOXY FLOORING

EPOXY.COM ELECTROSTATIC DISSIPATING HIGH-BUILD COATING SYSTEM
(1,000,000 to 1,000,000,000 ohms)


Epoxy.com Product #1 ESD 34-45 Mils

PART 1 - GENERAL

1.01 SUMMARY

Furnish all necessary materials, labor and equipment required to prepare substrate and install Electrostatic High-Build Coating System.

1.02 RELATED WORK

All drawings and general provisions of contract including General and Special Conditions.

1.03 QUALITY ASSURANCE

A. Manufacturer's Qualifications

1. Obtain primary Electrostatic High-Build Coating System materials including primers, resins, hardening agents and finish coats from a single manufacturer providing materials of the type specified in this section. Provide solvents and other secondary materials from a source recommended by the manufacturer of primary materials.

2. The Electrostatic High-Build Coating System manufacturer shall provide a representative who will instruct the applicator's crew on the proper techniques of mixing and applying the Electrostatic High-Build Coating System.

3. Installer to verify locations of all joints requiring a soft sealant and/or epoxy joint material. Follow recommendations of material manufacture for treatment of all joints, expansion joints, and cracks.

4. Portable mock-up: Prior to starting application of coating system, provide full scale portable mock-up to establish acceptable quality, durability, and appearance. Mock-up size must not be less than 4 square feet.

1. Acceptable mock-up to be standard of quality for installed work.

2. Unacceptable installed work to be removed and replaced until acceptable. Aesthetically unacceptable but well bonded work may be recoated per Manufacturer'cs instructions if thickness clearances permit.

5. Installer must be acceptable to architect, manufacturer, and owner.

1.04 WARRANTY

A. Contractor to guarantee work under this Section to be free from defects of material and installation for the duration of the warranty period. Defects occurring during warranty period shall be repaired, in a manner satisfactory to the Owner and the Architect, at no additional cost to the Owner.

1. Warranty Period: One (1) Year.

1.05 SUBMITTALS

A. Product Data Submit manufacturer's specifications on specific products of the Electrostatic High-Build Coating System and an overall system description, with installation instructions. Manufacturer's standard epoxy color charts shall also be submitted. Furnish three (3) sets of this information. Note that Epoxy.com Product #1 ESD coating color will vary slightly from standard color chart used for non-ESD epoxy colors. Final color selection should be confirmed with actual finished samples.

B. The applicator shall submit a 6"X6" system sample for verification purposes and finish texture approval and color.

1.06 MATERIAL DELIVERY, HANDLING AND STORAGE

A. Primary system materials shall be delivered in the manufacturer's undamaged, unopened containers. Each container shall be clearly marked with the following:

1. Product name

2. Manufacturer's name

3. Component designation (A or B, etc.)

4. Mixing ratio of component mixture

B. Provide equipment and personnel to handle the materials by methods which prevent damage.

C. The applicator shall promptly inspect all direct job site deliveries to assure that quantities are correct and that materials comply with requirements and are not damaged.

D. The applicator shall be responsible for all materials furnished by him, and he shall replace, at his own expense, all such material that is found to be defective in manufacture or that has become damaged in transit, handling or storage.

E. Store materials in accordance with manufacturer's instructions, with seals and labels intact and legible. Maintain temperatures within the required range. Do not use materials that have been stored for a longer period of time than the manufacturer's maximum recommended shelf life.

1.07 PROJECT CONDITIONS

A. Maintain the ambient room and the floor temperatures at 60 degrees Fahrenheit, or above, for a period extending from 72 hours before, during and after floor installation. Concrete to receive surfacing shall have cured for at least 28 days and shall have been free of water for at least 7 days.

B. Dew Point: Substrate temperature must be minimum of 5 degrees above dew point prior to, during or up to 24 hours after application of flooring system.

C. Illumination: Apply flooring system only where a minimum of 30 footcandles exist when measured 3 feet from surface.

D. Advise other trades of fixtures and fittings not to be installed until flooring is cured and protected.

1.08 PROTECTION

A. Protect adjacent surfaces not scheduled to receive the flooring by masking, or by other means, to maintain these surfaces free of the flooring material.

B. Provide adequate ventilation and fire protection at all mixing and placing operations. Prohibit smoking or use of spark or flame producing devices within 50 feet of any mixing or placing operation.

C. Provide polyethylene or rubber gloves or protective creams for all workmen engaged in applying products containing epoxy.

PART 2 - PRODUCTS

2.01 MATERIALS

A. System Overview

1. The coating system shall be Epoxy.com Electrostatic High-Build Coating System using Epoxy.com Product #899 Primer/Low Modulus Binder, Epoxy.com Product #1 Epoxy Body Coat, and Epoxy.com Product #1 ESD Epoxy Topcoat. This system shall be applied over a clean, properly prepared substrate.

2. Prior to system application, all joints and cracks are to be treated with semi-flexible epoxy joint filler and rigid epoxy crack filler respectively as described in the execution section.

3. The finished floor system shall be a minimum 34-45 mils in thickness, dense, nonporous and have a pigmented ESD epoxy sealer.

B. The rigid epoxy to be used for crack treatment shall be Epoxy.com Product #2704 Crack Filler or other epoxy approved by Manufacturer. The semi-flexible epoxy to be used for control joint filler shall be Epoxy.com Product #11 Joint Filler.

PART 3 - EXECUTION

3.01 PREPARATION

A. Obtain Architect's approval of mock-up before installing Electrostatic High-Build Coating System; see QUALITY ASSURANCE in PART 1.

B. Preparation of Surface:

1. Inspect surfaces to receive Electrostatic High-Build Coating System and verify that condition is smooth and free from conditions that will adversely affect execution, permanence, or quality of work. a. Remove all projections, all debris detrimental to flooring system, and dirt, oil contaminates, grease, and surface coatings affecting bond.

2. Notify Architect in writing prior to commencing work of any conditions deemed unsatisfactory for the installation; installation of flooring materials is understood as acceptance of the substrate as satisfactory.

3. Concrete: The General Contractor shall be responsible for hiring an independent testing service to test for moisture content and moisture vapor emission rate; install no flooring over concrete until the concrete has been cured and is sufficiently dry to achieve permanent bond with flooring as determined by material manufacturer's recommended bond and moisture tests.

a. Effectively remove concrete laitance by steel shot blasting or other method approved by flooring manufacturer.

b. Concrete slab shall have an efficient puncture-resistant reinforced moisture vapor barrier 15 mils thick minimum directly under the concrete slab (for slab on grade). Do not use vapor barrier manufactured with recycled material. Testing must be done to verify that the moisture vapor emission rate of the slab does not exceed that as recommended by the manufacturer at time of installation of the flooring or at any future date. Moisture vapor emission and moisture content testing must conform with the requirements of ASTM F-1869-98 (Calcium Chloride Test) and ASTM F-2170-02 (Relative Humidity Probe Test). If test results show excessive levels of moisture content or vapor emission rate, apply manufacturer's recommended moisture vapor emission control material.

C. Cracks and non-expansion joints shall be routed and filled with Epoxy.com Crack Filler and Epoxy.com Epoxy Joint Filler respectively.

3.02 APPLICATION

A. General Apply each component of the Electrostatic High-Build Coating System in compliance with manufacturer's installation instructions including mixing and application methods, recoat windows, cure times and environmental restrictions. The system is to be applied directly over all non-expansion joints and cracks that have been treated as previously described. Material applied over expansion or control joint material is subject to cracking due to movement in the joint.

B. Cracks and Non-Expansion Joints

1. Cracks less than 1/32" wide after surface preparation shall be filled with neat, rigid epoxy Epoxy.com Product #2704 or other resin approved by Manufacturer, mixed and applied as recommended by the manufacturer's printed instructions. All treated cracks are to be sanded prior to applying primer. Non-Expansion Joints shall be routed and filled with semi-flexible epoxy Epoxy.com #11

2. Those cracks larger than 1/32" wide shall be routed and filled with rigid epoxy Epoxy.com #2704 or other resin approved by Manufacturer, mixed and applied as recommended by the manufacturer's printed instructions.

C. Epoxy Primer Apply epoxy primer Epoxy.com Product #899 by squeegee and back roll at the rate of 200-250 square feet per gallon to thoroughly wet surface, but taking care not to "pond" the material.

D. Epoxy Basecoat Application

1. Apply 1-2 coats of Epoxy.com Product #1 Epoxy bodycoat at a minimum total thickness of 16 mils.

2. Follow manufacturer's instructions for mixing and application techniques.

E. ESD Epoxy Top Coat

1. Apply pigmented ESD epoxy top coat Epoxy.com Product #1-ESD to the cured epoxy coating to yield desired finish. Approximate coverage should be 125-160 square feet per gallon per coat to yield 10-12 dry mils per coat. Do not exceed 15 mils thickness or conductivity will be compromised.

2. Cure finish coat to manufacturer's recommendations.

F. Obtain architect/engineer's approval of the system just after completion of the final coat, prior to completion of curing.

3.03 CURING AND PROTECTION

A. Cure Electrostatic High-Build Coating System materials in compliance with manufacturer's directions, taking care to prevent contamination during stages of the application and prior to completion of the curing process.

B. Apply temporary protection until floor is fully cured. The General Contractor shall protect the finished floor from the time that the sub-contractor completes the work.

END OF SECTION

Proper mixing and installation is critical to the optimal success of all products.  See Installation Tips, Techdata, & MSDS for more details on our products.  Be sure to contact us with any questions and/or concerns that you have.

For more information please contact:

Epoxy.com
A Division of Epoxy Systems, Inc
A Vermont Corporation
USA

We have products that have passed the test of time as well as the best new Systems available today.

Since 1980 - 40 years of the highest quality products

Hours: 9AM-4PM Eastern Time (6AM-1PM Pacific Time)

Closed for lunch from 12Noon to 1PM


321-206-1833  Customer Service - Ordering and Order Status
                         Katey Lambert-Fontaine, VP - Chief Operations Officer
                         sales@epoxy.com

                        Technical Support
352-533-2167  Norm Lambert, President - Technical Support Director 
                         info@epoxy.com

352-489-1666  Accounting and Administration
                         Debby Lambert, CEO, and CFO

Copyright © 1994-2023 (providing online information about the right product for the right job for nearly 30 years)  EPOXY.COM a division of Epoxy Systems, Inc. - Florida and Vermont.  All rights reserved.

We accept MasterCard, Visa, American Express, Discover, Wire Transfers, and Cashiers Checks
We accept MasterCard, Visa, American Express, Discover, or Wire Transfers.